This equipment can produce circle or single furnace fused frame glass, screen, glass tableware etc. It can also use in decorating glass processing .Operating by PLC, heating up automatically in whole processing.
FGT-HF-BN-22 2200*1800mm Glass Fusing & Bending Furnace for digital screen
This equipment can produce circle or single furnace fused frame glass, screen, glass tableware etc. It can also use in decorating glass processing .Operating by PLC, heating up automatically in whole processing. the furnace lid rises up and down by electricity. Low electricity consumption, heating evenly ,high efficiency.
FGT-HF-BN-22 2200*1800mm Glass Fusing & Bending Furnace for digital screen
TECHNICAL SPECIFICATION
- Type AG-BN-31
- Max. glass size 2200*1800mm
- Glass thickness 2-25mm
- Amount of heating section 1 pieces
- Internal dimensions heating section 3110 x 1810mm
- Depth of heating section 800mm
- Install power 60 kw
- Capacity ≥6 units/8h
FGT-HF-BN-22 2200*1800mm Glass Fusing & Bending Furnace for digital screen
FEATURES
6.The heating element which can lift and down by manual control
The furnace is automatic control by PLC control system, includes the followings:
2. Controller for the temperature control
3, Thermocouple is measuring the temperature of indoor air in the furnace, The operating value of the overheating cover cannot be set over 1000oC.
All equipment in this tender, wherever necessary and feasible, will be packed within solid wooden cases and suitably protected with packing materials to minimize any risk of damage during transportation.
SPARES
Full compliment of necessary spares for 1 year running period.
INSTALLTION, COMMISSIONING AND TRAINING
For the complete installation, commissioning and one week training customer's personnel the manufacturer will send one specialists for one working week's time.
The cost of this work is USD50- per working day per person.
Air tariff, transportation from and to the airport, air-tickets, visa cost, boarding, meals, daily transport and insurance to be provided by the customer.
Other items will be required to put plant into operation and these are listed below and are excluded from our offer::
Any electrical filtration or power factor correction systems that may be needed.
CASES